01 / UNDERSTAND THE EQUIPMENT

Specify the duct assembly before selecting a sheet thickness

Luhai’s official spiral-duct item describes circular thin-wall duct made from metal strip with a spiral lock seam. It offers stainless or galvanised sheet, lists seven thickness options and recommends 3–4 m sections with special lengths available by agreement. This is a custom fabrication family, not a single dimensioned model or a fan with a rated airflow.

The inspected collage shows circular sections, seam close-ups and forming equipment. No readable pressure-class table, diameter schedule, leakage result or fire-resistance report appears in that image. The published “no air/water leakage” wording is therefore not used as a demonstrated zero-leakage performance claim.

02 / READ THE CONDITIONS

Published parameters and their scope

This is an equipment family; its range does not identify one orderable configuration.

Family designation
Custom spiral duct

Swipe the table, or focus it and use arrow keys, to read the conditions and sources.

Manufacturer-published values · conditions are part of the specification
ParameterPublished valueConditions and evidence
Listed sheet thicknesses0.5 / 0.6 / 0.8 / 1.0 / 1.2 / 1.5 / 2.0 mmCatalogue choices only; selected diameter, pressure and reinforcement still determine the approved construction. Source
Listed material choicesStainless steel or galvanised sheet; custom fabricationThe spiral item does not identify stainless grade, coating mass or a universal corrosion class. Source
Suggested section length3–4 m per section; special lengths by agreementA fabrication recommendation, not a guaranteed shipping length or site-access fit. Source
Packing wordingStandard goods packed; special cases may incur buyer-paid costConfirm crating/protection and freight terms in the offer; no export packing specification supplied. Source

Selection and application review

Calculate diameter and resistance as a system selection

Begin with airflow at each branch and the route, available space, noise requirement and required operating pressure. Select diameter using the project design and account for straight-run, bend, branch, transition and terminal losses. This page provides no manufacturer diameter/airflow chart, so a photographed tube cannot be assigned a numerical capacity.

Provide operating and design pressure, including negative-pressure extraction where applicable. Have the supplier return the diameter/thickness/reinforcement and joint schedule against those conditions. The thinnest catalogue choice is not automatically acceptable for a large diameter or suction service. Resolve the structural selection before comparing unit prices.

Choose metal grade and coating for the actual environment

The official item offers stainless and galvanised sheet but gives no stainless grade, coating mass or material certificate. Its descriptive text favours stainless in corrosive or particularly humid surroundings. That is a selection prompt, not proof of resistance to every process chemical. Provide gas/particle composition, moisture, temperature and cleaning agents for an appropriate material decision.

A neighbouring stainless welded-duct recommendation lists 201/304 and 0.8–3.0 mm. Those values belong to that different item; they are not silently attached to the spiral family. Ask for the offered grade, actual sheet thickness/tolerances, coating and material traceability. Distinguish base sheet from post-fabrication treatment and specify how cut ends and any welding are protected.

Separate general ventilation from kitchen, dust and material conveying duties

The item lists supply/exhaust ventilation, cooled air, kitchen smoke, dust removal and lightweight bulk-material conveying. These uses present different maintenance and safety requirements. A broad application list does not prove that one seam/joint configuration is suitable for grease-laden exhaust, abrasive particles or a hazardous process.

Comfort and general ventilation

Coordinate route, pressure, sound and insulation; define access to joints and dampers.

Kitchen or process extraction

Confirm the relevant construction, cleaning access, contaminants/temperature and any fire-protection requirement.

Dust or bulk-material transport

Review conveyed material, abrasion/deposition, cleanability and applicable hazard controls with the responsible designer.

Specify joints, fittings and a measurable leakage criterion

A continuous spiral seam is only one part of the assembly. The supplier page does not identify a tested leakage class or the exact connectors, gaskets, sealants and fixing arrangement included. Define the selected joint type and compatibility with bends, branches, reducers, equipment spigots and dampers. Ask which fittings are spiral formed, pressed, welded or bought in.

Replace absolute “not leaking” wording with the project’s measurable acceptance: test boundary, pressure, method, permissible leakage, sampling and records. Where a fire/smoke assembly is required, obtain evidence for the complete protected construction and its joints/supports. The separate material-board patent is not proof for this metal duct.

Plan insulation and condensation control for cooled air

The supplier specifically notes that cooled-air ducts require insulation and mentions internal insulation as an option. The item does not state thickness, conductivity, fire classification, vapour-control construction or hygiene/cleaning suitability of an offered lining. Agree whether insulation is internal or external and select it against the actual air and surrounding temperature/humidity.

Keep the insulation and vapour-control treatment continuous at field joints, supports and access points. For internal lining, agree attachment, exposed edges, cleaning and compatibility with the service. Ask whether the quotation covers the bare fabricated tube or a complete insulated assembly; an attractive metal finish does not establish condensation control.

Use section length to simplify transport and installation

The recommended 3–4 m straight section reduces the number of site joints compared with short pieces, but it must fit loading, delivery access, lifts/doorways and the route into the plant space. Confirm special lengths rather than assuming the longest available section is always the cheapest installed option. The packing note leaves special-case costs to agreement.

Issue a numbered cutting/section schedule and identify bend/branch orientation. Agree protection against dented ends, contaminated interiors and coating damage, with a packing list matching drawing tags. Check diameter/roundness, end compatibility, sheet thickness and visible seam condition on receipt, then carry out the required assembled-system tests.

  1. Freeze fabrication drawings

    Approve route, diameters, material/thickness, reinforcement, fitting dimensions and connection details.

  2. Confirm the commercial scope

    Close insulation, seals, supports, special lengths, packing/freight, staged dispatch and written warranty.

  3. Inspect and hand over

    Match tagged sections to drawings, check material/dimensions and complete the agreed joint/leakage and system commissioning records.

Sources and review scope

Compiled by HVACDeck Editorial. Source review identifies what the publication states; it is not an independent performance test or certification.

  1. Official Luhai spiral-duct pageChecked 2026-10-11 · Actual ordering text and original collage inspected; different neighbouring products not conflated.
  2. Historical Luhai installation guidanceChecked 2026-10-11 · Actual 2020 article read; unqualified fire-system dimensions not reproduced as universal design.
  3. Original material-board patent applicationChecked 2026-10-11 · Four-page original read; evidence scope only, no spiral-duct fire/leakage certification.

Editorial method and corrections · Report a detail with this page URL

Turn the evidence into an enquiry

Send the manufacturer your required duty, installation conditions and the unresolved items identified in this brief.

Continue the selection