Select the assembled chiller at the required water duty
Changde Binglun's official chiller catalogue includes 10P and 20P-labelled assemblies. The company page explicitly identifies chiller assembly production, while each product page mainly repeats its general supply scope rather than giving a model-specific performance table. The original 10P photograph shows a compressor, connected piping and horizontal cylindrical assemblies on frames in a workshop setting. It is an original equipment disclosure, not a complete verified bill of materials or cooling-capacity test.
The 10P and 20P labels are consolidated on this one chilled-water unit page. They are not converted into cooling kW, electrical input or a guaranteed process flow by treating P as a universal engineering unit. The useful next step is an issued selection at the actual water and condenser conditions. This brief explains how to make that enquiry comparable and which missing specifications affect an assembled-unit order.
Published parameters and their scope
This is an equipment family; its range does not identify one orderable configuration.
- Family designation
- 10P/20P chiller assembly family; labels consolidated
Swipe the table, or focus it and use arrow keys, to read the conditions and sources.
| Parameter | Published value | Conditions and evidence |
|---|---|---|
| Actual official catalogue labels | 10P and 20P chillers | Two inspected product pages; labels consolidated and not converted into cooling capacity. Source |
| Disclosed manufacturing role | Chiller assembly production | Explicit official company business list, not inferred fabrication of every purchased component. Source |
| Original construction evidence | Compressor, piping and framed horizontal assemblies | Actual 10P supplier photo inspected; exact component duties/models not established from appearance. Source |
| Rating schedule absent | No published complete cooling/input/water-flow table | Current selected performance must be supplied; no invented refrigerant or compressor model. Source |
| Installation scope unresolved | Condenser arrangement, pump/tank and controls to be issued | No assumption of self-contained all-inclusive package from the photographed frames. Source |
Selection and application review
Request cooling capacity at one defined water point
Issue required entering/leaving water temperatures, flow or thermal duty, water quality and operating pattern. Ask the assembler for the selected cooling capacity and complete electrical input at those conditions. Include the actual ambient or condenser-water conditions relevant to the selected design.
The official labels do not provide these paired conditions. Do not multiply a P count into assumed cooling kW or claim that a larger label automatically meets a process duty. Get a revision-controlled model selection and the basis of its rating before comparing quotations.
Identify the actual assembled circuit and purchased components
Request the compressor manufacturer/model, refrigerant, heat-exchanger functions and materials, piping/valve list and control architecture for the ordered assembly. The workshop photograph shows real components, but their detailed identities and certified pressure duties cannot be reliably read or inferred from shape alone.
The company separately sells third-party brands. Clarify which parts are bought in and which work is performed by Changde Binglun. Obtain the assembler nameplate, traceable purchased-component records and the agreed leak/run/electrical checks. Agency listings do not establish the components of this selected unit.
Close water, condenser and auxiliary interfaces
Ask for water-side pressure drop, allowable pressure, connections and required flow protection at the ordered duty. Identify whether pumps, tank, strainers and other hydraulic parts are included. The catalogue photo does not establish those accessories as supplied or prove pump head at the project boundary.
Confirm the actual heat-rejection arrangement and its separate utilities or equipment. An unexplained cylindrical component is not labelled here as a particular certified evaporator/condenser. Obtain selected drawings and the responsibility boundary for water treatment, connecting pipework and commissioning.
Accept the complete unit using issued documents
Agree capacity/input verification at the selected water and condenser conditions, plus documented assembly, leak, electrical and control checks appropriate to the delivered circuit. Identify alarms, flow interlocks, control sensor locations and the process start/stop sequence on an issued schematic.
Request dimensions, maintenance access and a spare-parts/warranty list. Current price, lead time, verified efficiency and independent long-term performance are unknown. The lack of a public numerical table remains explicit; a deeper sourcing brief does not turn that gap into a fabricated rating.
Issue the rated point
State water temperatures, flow/load and actual condenser-side conditions.
Define assembly and interfaces
Obtain selected component/circuit records, auxiliaries, connection losses and controls.
Agree delivered-unit evidence
Set performance and assembly acceptance with a clear installer/warranty boundary.
Sources and review scope
Compiled by HVACDeck Editorial. Source review identifies what the publication states; it is not an independent performance test or certification.
- Official 10P chiller pageChecked 2026-10-11 · Complete body and original workshop unit photograph read; no detailed capacity/refrigerant schedule.
- Official 20P chiller pageChecked 2026-10-11 · Complete body read; label included within the same chiller family rather than a padded model URL.
- Official company assembly scopeChecked 2026-10-11 · Explicit chiller/brine assembly statement read and kept separate from agency-brand sales.
Editorial method and corrections · Report a detail with this page URL
Turn the evidence into an enquiry
Send the manufacturer your required duty, installation conditions and the unresolved items identified in this brief.