Chilled-water side
Provide required cooling duty and entering/leaving temperatures, design flow, fluid composition and permissible pressure drop. Obtain the selected evaporator’s limits, connections and fouling basis.
A catalogue lead without a model schedule: obtain duty, water-side, part-load and controls data before sizing the cooling plant.
From Zhongda Air Conditioning Group Co., Ltd.
Individual product research · HVACDeck Editorial · Sources checked 2026-10-11
Zhongda’s original detail identifies a water-cooled screw chiller family and describes asymmetric five-to-six screw rotors, capacity adjustment, microcomputer control, remote control and ten self-protection functions. Those are manufacturer descriptions, not an independently tested efficiency or reliability result.
The product-model field is unfilled. Clicking the parameter tab does not reveal a numerical table, and the reviewed download-centre link returns to its reference-only listing. No rated capacity, input power, water temperatures/flows, refrigerant, dimensions or operating envelope can be established from these pages.
The original product image shows horizontal vessels, large water connections and several electrical/control cabinets. It illustrates the manufacturer’s equipment concept without providing a legible model plate or proving the delivered configuration. A purchase should start with a selected-model offer at the project’s chilled-water and condenser-water conditions.
This is an equipment family; its range does not identify one orderable configuration.
Swipe the table, or focus it and use arrow keys, to read the conditions and sources.
| Parameter | Published value | Conditions and evidence |
|---|---|---|
| Published equipment type | Water-cooled screw chiller family | A catalogue category, not a resolved individual model. Source |
| Compressor description | Five-to-six asymmetric screw-rotor design | Manufacturer wording; compressor make, model, refrigerant and circuit count not stated. Source |
| Capacity and controls wording | Capacity adjustment; microcomputer and remote control | Minimum load, adjustment method, controller and communication protocol remain unspecified. Source |
| Numerical performance schedule | Not established from the reviewed source | Unfilled model field and empty readable parameter section; no usable download schedule obtained. Source |
A nominal cooling-duty request alone cannot settle this family’s selection. Ask Zhongda for a specific model and matched chilled-water and condenser-water schedule, with the design conditions printed on the offer. The original catalogue provides no values to substitute for these inputs.
Provide required cooling duty and entering/leaving temperatures, design flow, fluid composition and permissible pressure drop. Obtain the selected evaporator’s limits, connections and fouling basis.
Define entering/leaving temperatures and available flow with the tower/heat-rejection design. Obtain condenser pressure drop, connection and water-quality requirements.
State available power and installation/service access. Request dimensions, shipping/operating weights, lifting requirements, clearances and electrical starting/operating data.
The source’s variable-capacity wording does not identify whether the selected configuration uses slide-valve unloading, speed control or another arrangement. It gives no minimum stable load, stage/circuit sequence or performance curve. Do not infer inverter operation from the phrase alone.
Request the supplier’s load-control description and capacity/input data at the project’s relevant load and water-temperature conditions. For a multi-unit plant, agree lead/lag, staging and water-flow behaviour with the controls designer. The five-to-six rotor description likewise does not prove a measured COP or superiority over a competing offer.
The page names ten self-protection functions but does not list them or show their thresholds. Remote control is advertised without a protocol or points list. A buyer needs these details to integrate and safely commission a real plant.
Obtain the exact protection/alarm list, thresholds, reset requirements and required water-flow/pump interlocks for the selected model.
Read the sourceAsk for controller identity, protocol, interface hardware, writable/read-only points and the division of responsibility between chiller and plant controller.
Require the current wiring/control documents and supplier commissioning procedure; record verified interlocks and settings during acceptance.
Zhongda separately markets cooling towers and other HVAC equipment. Their presence elsewhere in its catalogue does not establish that this chiller price includes them. The illustrated water connections and cabinets are not an itemised bill of materials.
Agree responsibility for heat rejection, pumps, strainers, water treatment, valves, instrumentation, insulation, power and controls work. Confirm the actual chiller’s included accessories and required site provisions. Compare a complete agreed scope rather than treating a machine-only offer as an installed plant.
There is no numerical rating or independent model test in the reviewed public pages. Request the applicable performance report or witnessed factory-test proposal and match model, refrigerant, electrical supply, water conditions and measurement scope. A corporate engineering qualification or procurement candidacy does not replace that evidence.
At site, agree who establishes stable operating conditions, supplies the instruments and signs the trial-acceptance record. The published warranty begins from successful equipment trial acceptance, so the acceptance event should be defined before delivery. Do not promise a cooling duty, energy saving or noise level that the selected offer has not established.
The official corporate service page states a 12-month warranty from successful trial acceptance. It distinguishes urban two-hour response, eight-hour arrival and repair timing dependent on whether parts need replacement. Those are attributed terms whose geographic and contractual application still needs confirmation for this installation.
Resolve model selection, duty/inputs, water-side and electrical schedules, included scope, documents and acceptance method.
Confirm supplier/site responsibilities, approved water and electrical conditions, interlocks, access and operator training.
Keep model/serial identification, approved schedules, test and trial-acceptance records, training documents and the agreed warranty/support contact.
Read the sourceCompiled by HVACDeck Editorial. Source review identifies what the publication states; it is not an independent performance test or certification.
Editorial method and corrections · Report a detail with this page URL
Send the manufacturer your required duty, installation conditions and the unresolved items identified in this brief.