MANUFACTURER / SOURCE REVIEW

Zhongda · central air conditioning and project delivery

Zhongda Air Conditioning Group Co., Ltd.

Dezhou equipment and installation business: review the chiller selection, engineering scope and acceptance-based service terms separately.

德州市, 山东省, China

Prepare a technical enquiry
1 published equipment referenceLatest source review 2026-10-11
01 / COMPANY

What this manufacturer offers

Zhongda Air Conditioning Group’s official site presents a broad central-air-conditioning business in Dezhou, covering main units, terminals, ventilation, cooling towers and associated products. Its reviewed water-cooled screw page is a catalogue family without a filled-in model or numerical selection table. That distinction matters when deciding whether to buy a machine or procure an installed cooling system.

An original August 2026 public-procurement notice names 中大空调集团有限公司 as the second-ranked candidate for a university kitchen ventilation and fume-treatment contract. It records relevant contracting qualifications for that competition. A candidate notice is not a completed project, a final award or a performance report for the water-cooled screw family.

The supplier publishes relatively specific service wording, including a 12-month warranty from successful equipment trial acceptance. Buyers should connect that wording to their actual delivery location, acceptance procedure and contract, especially where export installation and service are involved.

Official company name
中大空调集团有限公司Official company/contact pages; exact name also appears in the original 2026 candidate notice. Source
Published location
Zhongda Industrial Park, Dezhou Economic Development Zone, ShandongOverview identifies Jinghua Road; contact/footer uses Zhongda Beilaite Industrial Park. Confirm the order’s dispatch and service address. Source
Equipment under review
Water-cooled screw chiller catalogue familyProduct model field and parameter section provide no numerical selection schedule. Source
Warranty start stated by supplier
12 months from successful equipment trial acceptanceCorporate service wording; acceptance procedure and destination coverage need agreement. Source
02 / EQUIPMENT

Published equipment and selection evidence

Water-cooled screw chiller catalogue family
series REFERENCE

Water-cooled screw chiller catalogue family

Catalogue reference: Water-cooled screw catalogue

Open the equipment selection brief
Parameters and source limits · Water-cooled screw catalogue

Swipe the table, or focus it and use arrow keys, to read conditions and sources.

Manufacturer-published information · Water-cooled screw catalogue
ParameterPublished valueConditions and evidence
Published equipment typeWater-cooled screw chiller familyA catalogue category, not a resolved individual model. Source
Compressor descriptionFive-to-six asymmetric screw-rotor designManufacturer wording; compressor make, model, refrigerant and circuit count not stated. Source
Capacity and controls wordingCapacity adjustment; microcomputer and remote controlMinimum load, adjustment method, controller and communication protocol remain unspecified. Source
Numerical performance scheduleNot established from the reviewed sourceUnfilled model field and empty readable parameter section; no usable download schedule obtained. Source
03 / PROJECT REVIEW

Zhongda combines equipment supply with an engineering role

Choose equipment-only or installed-system responsibilities

The site markets both HVAC equipment and engineering capability. A broad supplier catalogue does not identify everything included in a chiller purchase. Keep responsibility for plant design, cooling-water infrastructure, installation and commissioning explicit.

Equipment purchase

Request the selected chiller model, design-condition schedule, shipping configuration, accessories, controls interface and factory-test documents.

Read the source

Installed cooling system

Define who supplies tower/condenser-water and chilled-water systems, electrical and controls work, installation and site performance acceptance.

Ventilation or other project work

Use qualifications and references that match that contract’s scope. A kitchen-ventilation candidate record does not test a screw chiller.

Read the source

What the original procurement notice establishes

The notice published on 21 August 2026 concerns the second lot of the Beijing University of Science and Technology Xiong’an campus kitchen ventilation and fume-treatment systems. It lists Zhongda as second-ranked candidate and records Grade II general mechanical/electrical contracting and Grade I specialised building mechanical/electrical installation qualifications in its response table.

This is useful evidence of an engineering role at the time of that competition. It is deliberately not described as a final award, an independently verified installation outcome or a product certificate. Check current qualification documents and comparable completed references for the work being commissioned.

Recorded in the original notice

Exact company name, candidate ranking and qualification response are visible in the issuer’s public record.

Read the source

Still needed for the buyer’s contract

Current certificate identity/scope, contracting entity, named project staff, completed acceptance records and the actual delivery/service boundary.

Read corporate scale and history as attributed claims

The official overview says the group began in 1994 and describes a substantial Dezhou campus, workforce and export activity. These are corporate statements rather than this platform’s current factory audit. The page mixes historical export information, headline category counts and a larger series/variety count in its prose; they are not a current model inventory or proof of available delivery capacity.

For a time-sensitive order, ask which site builds the chosen main unit, what production/test work remains and when the approved configuration can ship. Request a traceable order schedule rather than inferring lead time from group-wide scale. Its ISO9001/ISO14001 statements also need current certificate numbers, scope, sites and validity before becoming qualification evidence.

Water-cooled screw marketing does not complete a technical offer

The detail page describes a five-to-six asymmetric screw-rotor arrangement, capacity adjustment, microcomputer control, remote-control capability and ten self-protection functions. It does not identify the compressor make/model, refrigerant, controller protocol, protection schedule or rated performance. The product-model field is unfilled, and the parameter tab contains no readable numerical table.

The download centre lists a September 2022 electronic-catalogue test entry with a reference-only label. Its download link opens the same listing rather than a usable technical file. This review therefore has not obtained a complete selection catalogue. Ask for the current selected-model sheet and an agreed performance/test basis.

Distinguish warranty, response, arrival and repair

The service page states 12 months from successful equipment trial acceptance, with responsibility for qualifying product-quality problems. Its response wording promises two hours within urban areas, eight hours to arrive for repair, 24 hours to resolve faults without replacement parts and 72 hours where replacement is needed. Those stages and conditions should not be collapsed into a worldwide two-hour repair promise.

The site describes training at start-up and subsequent operator/technical training, technical support and visits after warranty. It does not establish that overseas travel, freight, customs, labour or replacement parts are free indefinitely. Agree the service party, geographic coverage, charges, stock, escalation and warranty start/acceptance records in writing.

  1. Record the start event

    Define trial acceptance, sign-off documents and handling of delayed installation before applying the published 12-month period.

    Read the source
  2. Record support coverage

    Agree response versus arrival, working hours, destination access, competent local support and responsibility for parts logistics.

  3. Record handover and exclusions

    Retain model/serial and operating records, training and commissioning reports, applicable warranty exclusions and post-warranty charges.

07 / TRANSPARENCY

Sources and review scope

Compiled by HVACDeck Editorial. Page review: 2026-10-11. Publications are attributed below; their statements are not independent measurements by this platform.

  1. Zhongda official company overviewChecked 2026-10-11 · Full overview read; scale, history, ISO and export wording remain attributed statements.
  2. Original water-cooled screw product pageChecked 2026-10-11 · Description and parameter tab inspected; model/numerical schedule absent. Original product image read.
  3. Official after-sales termsChecked 2026-10-11 · Acceptance-based warranty, urban response/arrival and parts-dependent repair wording read in full.
  4. Official contact informationChecked 2026-10-11 · Company and industrial-park address checked; email kept in private CRM field.
  5. Original August 2026 procurement candidate noticeChecked 2026-10-11 · Second candidate and qualification-response table; not final award, completion or chiller performance proof.
  6. Official download centreChecked 2026-10-11 · 2022 reference-only test entry points back to its listing; no usable technical catalogue obtained.

How we review sources · Represent this factory or request a correction

Continue your equipment research

Prepare your equipment brief