EQUIPMENT / EQUIPMENT FAMILY

Xinhuaxing TLF80/95 copper-aluminium radiator

Published 300–1800 mm centre-distance options for water heating: obtain heat output at the room’s design temperatures before choosing section count.

From Shandong Xinhuaxing HVAC Technology Co., Ltd.

Individual product research · HVACDeck Editorial · Sources checked 2026-10-11

TLF80/95 copper-aluminium heating radiator family
Manufacturer catalogue image · TLF80/95
01 / UNDERSTAND THE EQUIPMENT

Size the radiator from a stated heat duty and verified configuration

Xinhuaxing’s original TLF80/95 detail describes a copper-aluminium composite radiator for central or independent water-heating systems. It lists selectable colours, connection sizes written as 4分/6分 and a selectable centre-distance range of 300–1800 mm. It does not publish a heat-output table, operating pressure/temperature, full dimensions or a configuration-by-configuration section count.

The four source images were read individually. They show an interior illustration, a finished radiator close-up, connection accessories and cutaway views with copper-coloured tubes in an aluminium-looking outer section. These support understanding of the manufacturer’s composite description; they do not independently verify alloy, tube thickness, joint method or thermal performance.

For a new room or replacement, the useful next step is a selected-size drawing and output evidence at the actual supply/return and room temperatures. The model string alone cannot determine how many sections a room needs or whether its existing pipe centres will match.

02 / READ THE CONDITIONS

Published parameters and their scope

This is an equipment family; its range does not identify one orderable configuration.

Family designation
TLF80/95

Swipe the table, or focus it and use arrow keys, to read the conditions and sources.

Manufacturer-published values · conditions are part of the specification
ParameterPublished valueConditions and evidence
Catalogue modelTLF80/95Exact page identifier. The numbers are not treated as confirmed dimensions without a drawing. Source
Declared constructionCopper-aluminium compositeOfficial material statement and cutaway illustrations; composition and manufacturing detail require supplier documentation. Source
Published centre-distance range300–1800 mmSelectable family range. Centre distance is not overall height, width or bracket spacing. Source
Connection options4分 / 6分Original Chinese nominal-size notation. Confirm the exact thread, gender, seal and supplied fitting from a drawing. Source
Stated water-heating contextsCentral heating or independent heatingManufacturer application statement; actual system pressure, temperatures and water chemistry still need approval. Source
Finish choiceSelectable coloursNo finish code, coating specification or durability report published in the readable detail. Source

Selection and application review

Choose sections from output at the project’s temperatures

No watts-per-section or output curve was established from this page. Do not convert the pictured radiator’s section count into a room-sizing rule. Provide the room’s calculated heat loss, design supply/return water temperatures and intended room temperature. Request the selected height/configuration’s heat-output report and any correction method for the project conditions.

For a lower-temperature heating source, obtain output at that actual duty rather than assuming a catalogue rating measured at hotter water will still meet the room load. The family listing’s central/independent wording does not establish compatibility with every heat-pump system or boiler control arrangement.

Centre distance and installation space answer different questions

The 300–1800 mm selectable centre-distance range is useful for checking an existing water connection layout. It is not a complete dimensional schedule.

Matching the pipework

Confirm the ordered centre distance, connection orientation and exact 4分/6分 interface. Obtain the approved drawing before assuming the existing valves or adapters fit.

Read the source

Fitting the room and wall

Request overall height/width/depth, assembled section count, operating weight, bracket layout and required clearances. Centre distance alone cannot confirm wall or enclosure fit.

The accessory photograph is not an itemised delivery list

One gallery image shows valves, a vent-like fitting and an end plug, while the close-up shows a finished radiator connection area. The listing does not state whether every pictured accessory is included in the TLF80/95 order or identify its model/thread.

Ask for an itemised package covering radiator assembly, brackets, valves/adapters, vents/plugs and any seals. If controls or thermostatic valves are proposed, identify their own specifications and the system arrangement. Obtain installation instructions for the exact assembly rather than tightening or sealing based on a photograph.

Copper-aluminium construction still needs operating limits

The material label and cutaway illustrations do not supply allowable pressure, maximum water temperature, permitted water chemistry or a corrosion guarantee. Request those conditions for the selected assembly, including joint/seal materials and any system-treatment restrictions.

Thermal evidence

Request the exact configuration’s output, test conditions, report identity and applicable rating method, with data that can be used for room selection.

Mechanical and hydraulic evidence

Request operating limits, flow/pressure-drop information, approved connection details and installation/pressure-check instructions.

Material and order quality

Request tube/outer-section specifications where required, batch identification, leak/pressure inspection evidence and coating/finish details tied to the supplied order.

Company claims and another radiator standard do not prove this model

The company overview makes broad certification and historical quality-sampling statements. This review did not establish a current model-specific TLF80/95 report from those statements. The original standards-platform record names the company in a steel-aluminium radiator standard project, which is a different material family from this copper-aluminium product.

Require the applicable standard/edition and the actual covered configuration’s evidence. Do not transfer a steel-aluminium drafting role or a sampled steel-radiator result to TLF80/95. Government sampling attachments found in research were inaccessible in full, so their extracts are not used here as a verified pass result.

Agree the actual warranty and commissioning responsibilities

The detail’s warranty field says it follows national standards but specifies no duration, start date, exclusions or claim procedure. The reviewed service-system page provides no readable detailed terms. Ask for written coverage for the selected radiator and project location; a corporate insurance headline is not the same as the buyer’s warranty.

  1. Approve the room and product schedule

    Confirm design heat duty, chosen height/section count, output conditions, connections, finish and included parts.

  2. Coordinate installation and checks

    Use the supplier’s current instructions and the system designer’s requirements for support, connections, flushing/filling, venting and commissioning.

  3. Record handover and support

    Keep model/configuration and batch identifiers, acceptance records, warranty terms and the responsible after-sales contact.

Sources and review scope

Compiled by HVACDeck Editorial. Source review identifies what the publication states; it is not an independent performance test or certification.

  1. Xinhuaxing TLF80/95 original detail and four-image galleryChecked 2026-10-11 · All readable fields and four images inspected; no output table, operating limits, full dimensions or warranty duration established.
  2. Official company overviewChecked 2026-10-11 · Corporate quality/certification/capacity/insurance wording read; not treated as a current model report.
  3. Official service-system pageChecked 2026-10-11 · No readable detailed warranty/service terms established beyond navigation and contact footer.
  4. National-standard project: steel-aluminium radiatorChecked 2026-10-11 · Original 20080184-T-333/GB/T31542-2015 project record names company; different material family, not TLF80/95 certification.

Editorial method and corrections · Report a detail with this page URL

Turn the evidence into an enquiry

Send the manufacturer your required duty, installation conditions and the unresolved items identified in this brief.

Continue the selection