1 published equipment referenceLatest source review 2026-10-11
01 / COMPANY
What this manufacturer offers
Shandong Xinhuaxing HVAC Technology’s official catalogue separates steel-aluminium composite, copper-aluminium composite and steel radiator ranges, alongside bathroom/electric towel rails and boilers. Its company overview describes radiator manufacturing and project supply, and the site publishes a contact address on Yuntaishan Road in the Laiwu High-Tech Zone of Jinan.
The reviewed TLF80/95 is specifically a copper-aluminium water-heating radiator, with a stated 300–1800 mm selectable centre-distance range and 4分/6分 connection options. The manufacturer’s wider radiator range cannot supply this family’s missing heat-output or operating-limit figures.
The original national standards project record names the company as a drafting participant for a steel-aluminium radiator standard. That helps substantiate a specific standards role, while the material-family difference matters: it does not establish conformity or test results for the copper-aluminium TLF80/95.
Official Chinese company
山东鑫华星暖通科技有限公司Site company/footer name and original steel-aluminium standards-project drafting record. Source
Published contact location
022 Yuntaishan Road, Laiwu High-Tech Zone, Jinan, ShandongOfficial footer text. Confirm the current manufacturing/delivery site in the order. Source
Steel-aluminium radiator project 20080184-T-333Issuer record lists company; published standard number GB/T31542-2015. Not a copper-aluminium model certificate. Source
Swipe the table, or focus it and use arrow keys, to read conditions and sources.
Manufacturer-published information · TLF80/95
Parameter
Published value
Conditions and evidence
Catalogue model
TLF80/95
Exact page identifier. The numbers are not treated as confirmed dimensions without a drawing. Source
Declared construction
Copper-aluminium composite
Official material statement and cutaway illustrations; composition and manufacturing detail require supplier documentation. Source
Published centre-distance range
300–1800 mm
Selectable family range. Centre distance is not overall height, width or bracket spacing. Source
Connection options
4分 / 6分
Original Chinese nominal-size notation. Confirm the exact thread, gender, seal and supplied fitting from a drawing. Source
Stated water-heating contexts
Central heating or independent heating
Manufacturer application statement; actual system pressure, temperatures and water chemistry still need approval. Source
Finish choice
Selectable colours
No finish code, coating specification or durability report published in the readable detail. Source
03 / PROJECT REVIEW
A radiator factory review should follow the material family and order schedule
Compare the actual material family before using evidence
The website’s separate product families should remain separate in a technical quotation and document review. A familiar brand name cannot settle tube/joint construction, pressure limits or heat output for all its radiators.
Copper-aluminium TLF80/95
The source identifies composite construction, selectable centre distances and water-heating use. Request the chosen configuration’s thermal and mechanical schedule.
The original standard-project record supports the company’s drafting role in this material family. It is not evidence of conformity for every configuration.
Obtain their own model data, quality records and operating conditions. Do not transfer a copper-aluminium selection or standard scope to these different items.
Production scale is a manufacturer statement, not an available delivery slot
The overview reports more than ten million radiator sections annually, over 30,000 sections daily and monthly supply capability above one million sections. These are corporate self-reports in the reviewed overview, not independently measured current output, audited shipments or capacity reserved for TLF80/95. “Sections” should not be silently converted into complete assembled radiators.
For a project order, request the selected height/section count, drawing, bill of materials, batch identification and production/delivery schedule. Agree sample approval and the inspection/packing requirements for finish, joints and connections. The actual assembly mix and shipment plan matter more than a company-wide total.
Broad quality and certification statements need current documents
The overview cites ISO9001:2008, ISO14001:2004 and a 28001:2011 safety-management version, plus many historical quality-sampling and industry-recognition statements. This review did not establish the current certificate numbers, scope, sites and validity from those prose claims. They are not presented as current model approvals.
Government sampling attachments located during research returned 403 and were not read in full. No TLF80/95 pass result is inferred from a search extract or a different model. Obtain the current certificate schedule where relevant and the actual product test/inspection report, with model, dimensions, material family, conditions and batch scope.
Thermal evidence for the ordered assembly
Match the output report and rating conditions to the selected height and section count; obtain correction data for the project’s water/room temperatures.
Mechanical and order inspection evidence
Request operating limits, approved connections, material/joint records and leak/pressure inspection evidence for the supplied configuration.
Management-system evidence
Check current certificate identity, site and scope separately from product-performance evidence. The public old-version wording does not resolve today’s certificate status.
The original standards record has a defined material and history
The standards platform’s original project page identifies steel-aluminium compound radiator plan 20080184-T-333, assigned in July 2008, and records GB/T31542-2015 publication on 15 May 2015 and implementation on 1 February 2016. 山东鑫华星暖通科技有限公司 appears in its drafting-unit list.
This supports that particular historical contribution. It is not used here as a complete audit of the standard’s present status, every technical clause or a TLF80/95 conformity result. For a copper-aluminium order, ask the supplier to state the applicable standard and edition and provide the actual covered configuration’s documents.
Insurance, distribution and customer names need their own scope
The company overview reports offices, domestic outlets, overseas sales and named project customers. These are attributed business claims, not verification of a destination’s current service capability or the buyer’s contract relationship. The review does not adopt them as independent customer endorsements.
Its headline product-quality insurance wording gives a RMB 20 million limit but no current policy schedule, insured period, covered event, territorial scope or claim conditions. That figure is not a warranty payout promised to each buyer. Request the applicable policy and contract terms if insurance matters to the order.
The TLF80/95 warranty field only says it follows national standards, and the service-system page supplies no readable detailed terms. Agree the actual period, start date, exclusions, service party and claim procedure before relying on coverage.
An order ready for installation needs more than colour and centre distance
TLF80/95 permits colour choice and centre distances, but these are not enough to select heat output or confirm installation. Provide calculated room loads, supply/return and room temperatures, pipe layout and installation constraints.
Approve the radiator schedule
Agree family/model, height/centre distance, section count, output at design conditions, overall dimensions, finish and connection drawing.
Approve delivery contents and quality
Specify valves/adapters, vents/plugs, brackets and documents; identify applicable sample/batch inspection and packing requirements.
Approve installation and service responsibilities
Use the selected assembly’s current instructions, record commissioning/acceptance and retain identifiers, warranty terms and the responsible support contact.
07 / TRANSPARENCY
Sources and review scope
Compiled by HVACDeck Editorial. Page review: 2026-10-11. Publications are attributed below; their statements are not independent measurements by this platform.
Xinhuaxing official company overviewChecked 2026-10-11 · Full corporate scale, quality, old-version certification, insurance and sales wording read; current claims not independently certified.