MANUFACTURER / SOURCE REVIEW

Hebei Turbine Fan · Qianan rotating-component manufacture

Read the dated government machining/repair disclosure alongside the official catalogue, and obtain current selected-part inspection evidence.

Qianan, Hebei, China

Prepare a technical enquiry
1 published equipment referenceLatest source review 2026-10-11
01 / COMPANY

What this manufacturer offers

Hebei Turbine Fan Manufacturing Co., Ltd., legally 河北透平风机制造有限公司, discloses fan/rotating-equipment component manufacture and repair in Qianan, Hebei. The preserved CRM export gives incorporation on 27 October 2015 and credit code 91130283MA07KFYY8Y. Its registered locality between Weijiu and Weishi streets in the Qianan development area agrees with the current official contact and a government-published 2021 project record. The historical project report also describes a start in October 2015, independently supporting the year/month without being a new registry certificate.

The strongest manufacturing evidence reviewed is the January 2021 technical-upgrade environmental report published by Qianan government: it describes existing machining, welding, balancing and repair routes, and proposed additional equipment without increased capacity. Its dated inventory and project figures are not presented as an audited 2026 machine list or production rate. The official catalogue's multistage, single-inlet and open-impeller pages show actual rotating components but no complete fan rating schedules. This profile focuses on the parts/repair sourcing boundary rather than claiming qualified refrigeration equipment, current emissions licensing or independently verified university partnerships.

Preserved incorporation record
27 October 2015; 河北透平风机制造有限公司Original CRM export; January 2021 project report independently describes October 2015 establishment. Source
Matched manufacturing locality
Between Weijiu and Weishi streets, Qianan development areaCRM registered, current official contact and government project address agree; no fresh site visit. Source
Dated existing process route
Cutting, machining, welding, balance inspection and storageJanuary 2021 government-published report; not a newly witnessed production audit. Source
Upgrade scope as documented
26 proposed production-equipment additions; no capacity increase2021 technical-upgrade proposal, not proof every listed addition was completed or operates today. Source
Outsourcing boundary in report
Existing annealing described as outsourcedThe same report proposes electric-furnace equipment; current in-house/outsourced route must be confirmed. Source
Historical project completion report
Laser-cladding repair and spare-processing project reported complete in July 2018Municipal news about an earlier project, not final acceptance of the 2021 upgrade. Source
Catalogue construction evidence
Multistage shaft/impellers, single-inlet wheel and open impellerActual original photographs inspected; no complete selected fan curve or motor schedule. Source
Company-site domain difference
Visited CRM .cn site; contact text names .comExact name/address/phones agree; the .com domain was not independently verified as an equivalent current site. Source
02 / EQUIPMENT

Published equipment and selection evidence

Hebei Turbine Fan rotors and impellers · Drawing and balance review
series REFERENCE

Hebei Turbine Fan rotors and impellers · Drawing and balance review

Catalogue reference: Fan/blower rotor and impeller components; configurations consolidated

Open the equipment selection brief
Parameters and source limits · Fan/blower rotor and impeller components; configurations consolidated

Swipe the table, or focus it and use arrow keys, to read conditions and sources.

Manufacturer-published information · Fan/blower rotor and impeller components; configurations consolidated
ParameterPublished valueConditions and evidence
Actual multistage photographShaft assembly with several impellersOfficial multistage blower-labelled page; no complete blower/motor assembly or rated point. Source
Actual single-inlet/open-wheel photosRed inlet wheel and separate open-impeller constructionOriginal supplier photos read; dimensions, material, speed and part numbers unknown. Source
Dated machining routeCutting, machining, welded assembly and balance-related inspectionJanuary 2021 government-published report, not a current selected-part test. Source
Dated repair routeInspection/measurement, repair machining/welding and balancingHistoric disclosure; suitability and permitted repair require component-specific approval. Source
Published rating gapsNo inspected curve, rpm, material grade, balance criterion or tolerancesNo invented aerodynamic or mechanical performance. Source
Quotation choicesNew replacement versus approved repairScope must identify original machine, drawing revision, outsourced work and acceptance records. Source
03 / PROJECT REVIEW

Evaluate the manufacturing route behind an ordered fan component

Keep the legal, location and website evidence together

Use the exact Chinese contracting name and request current registration/order documents. The CRM 2015 date agrees at month/year level with the government's dated project report. The current official address agrees with that report and the imported registered locality. Older correspondence entries in CRM remain preserved rather than being overwritten.

The reviewed website is the CRM .cn domain, while its contact text prints a .com address. That string is not treated as an independently verified second website. Confirm current communication and the actual assembly/repair dispatch point when issuing an enquiry. No present workshop visit has been conducted.

Read the manufacturing route from its dated technical report

The January 2021 report describes raw-material cutting, machining to drawings, welded assembly, balance-related inspection and storage for blades/spares. Its existing repair route starts with inspection and measurement of damage, then repair machining/welding and subsequent balancing. This is more specific than the website's general technical-strength language, but it remains a dated project document.

The report distinguishes existing equipment from 26 proposed production additions and states no capacity increase. It also describes existing annealing as outsourced while proposing electric-furnace equipment. Ask which processes are performed today, where heat treatment/coating is done and who issues material, welding, dimensional and balance records for the ordered component. A proposal is not evidence that every machine was installed.

Separate historical approvals from present qualification

The municipal notice dated 25 January 2021 is an environmental-report acceptance and proposed-approval public notice. Its attached report recounts earlier environmental approval/self-acceptance history, but no final 2021 upgrade decision or fresh operating status was retrieved. The report's statement that the enterprise lacked a discharge permit belongs to its 2021 context and is not projected onto 2026.

A July 2018 municipal news item reports completion of an earlier laser-cladding/spare-processing project. It supports dated industrial activity, not current emissions compliance or a product certificate. The website's partnership and regional-ranking claims are supplier statements; no university-side confirmation or independent ranking assessment was read.

Matched identity and location

CRM, official contact and government project report describe the same named company and Qianan locality.

Read the source

Specific dated manufacturing route

The attached report describes machining, welding, balancing, outsourcing and upgrade boundaries.

Read the source

Current evidence remains necessary

Actual present process, selected-component tests, current applicable documents and delivery capacity are not independently established.

Read the source

Select a component rather than borrowing an entire fan rating

The multistage blower page shows a shaft with several impellers rather than an issued complete blower/motor package. The single-inlet page shows a wheel and the open-impeller page shows another component form. Their headings identify catalogue context; no flow/pressure curve, speed, material grade or machine interface is published in the reviewed text.

Request the original equipment/model, approved drawing and service medium/temperature/speed. Define new replacement versus repair and the selected inspection/acceptance boundary. TRT and steam-turbine material elsewhere in the site does not automatically qualify a part for a particular building-ventilation or refrigeration application. Do not infer complete equipment performance from a rotating-part photograph.

Agree traceability and responsibility for the ordered work

For new work, obtain material identity, manufacturing/heat-treatment route, interfaces and dimensional/balance criteria on approved documents. For repair, obtain incoming-condition records, approved repair limits, responsible engineering assessment and final inspection/report scope. Website repair advertising is not a recommendation to repair every damaged rotor.

Identify the source of purchased parts and any outsourced processes, plus warranty, service and spare support. The valid customer-service email read on the official contact page is stored only in private CRM, without outreach. Current prices, lead times, audited annual capacity and independently verified service-life improvements remain unknown.

07 / TRANSPARENCY

Sources and review scope

Compiled by HVACDeck Editorial. Page review: 2026-10-11. Publications are attributed below; their statements are not independent measurements by this platform.

  1. Official Hebei Turbine Fan company pageChecked 2026-10-11 · Complete company description read; partnership/ranking and technical claims remain supplier statements.
  2. Official contact pageChecked 2026-10-11 · Exact company locality and valid email read; .com text differs from visited CRM .cn domain and is not treated as verified redirect.
  3. Qianan 2021 project notice and attached reportChecked 2026-10-11 · Full notice and relevant original DOCX identity, existing process, equipment/upgrade and outsourcing tables read; acceptance/proposed approval not final 2021 decision.
  4. Qianan July 2018 project progress reportChecked 2026-10-11 · Full official item read; earlier laser-cladding/spares project reported complete within its date.
  5. Official multistage blower component pageChecked 2026-10-11 · Full body and original shaft/impeller photograph inspected; no complete fan schedule or motor assembly inferred.
  6. Original government-published technical report attachmentChecked 2026-10-11 · January 2021 DOCX downloaded from the actual notice link; existing/proposed equipment and process sections read, no current capacity assertion.
  7. Official single-inlet fan-labelled componentChecked 2026-10-11 · Original red wheel image and full page read; no motor/casing or numerical selection inferred.
  8. Official open impellerChecked 2026-10-11 · Original component photograph and full body read; no inferred material, speed or size.