1 published equipment referenceLatest source review 2026-10-07
01 / COMPANY
What this manufacturer offers
Zhejiang Jinyi HVAC Equipment Co., Ltd. publishes duct products from Quzhou, including steel-faced magnesium composite ducts, magnesium composite boards, spiral ducts and stainless-steel ducts. The two composite-product pages reviewed for this profile describe a business selling composite board and duct products. They do not establish a documented in-house board-production process or a particular fabricated duct specification.
The company’s published contact address is Room 302, Building 37, No. 28 Yulong Road, Quzhou. That is a contact address, not a verified factory-floor location. Its company-introduction page has no substantive biography in the readable body. We have therefore left founding date, plant size, equipment ownership, staffing and output capacity unspecified rather than constructing a history from the website’s promotional wording.
A Zhejiang government-hosted enterprise list provides a limited independent identity check: row 1453 names 浙江今易暖通设备有限公司 and code 91330803MABLMXF790. It does not certify a composite duct product. The useful next decision is whether the quotation covers board supply, fabricated ducts or an installed assembly, because each needs different documents.
Name and code in the public list
浙江今易暖通设备有限公司 · 91330803MABLMXF790Row 1453, PDF page 34, on a Zhejiang government-hosted list. Identity reference, not a current registration-status or product-approval check. Source
Published contact address
Room 302, Building 37, No. 28 Yulong Road, QuzhouOfficial site contact address; manufacturing-site location has not been established. Source
Composite-product publications
Steel-faced magnesium composite ducts; magnesium high-crystal composite duct boardSeparate catalogue headings dated 1 July and 30 June 2022. The readable descriptions give sales scope rather than a complete technical schedule. Source
Parameters and source limits · Steel-faced magnesium composite ducts
Swipe the table, or focus it and use arrow keys, to read conditions and sources.
Manufacturer-published information · Steel-faced magnesium composite ducts
Parameter
Published value
Conditions and evidence
Published item
Steel-faced magnesium composite ducts
Catalogue heading; not a complete panel build-up, material specification or selected duct schedule. Source
Distinct neighbouring offer
Magnesium high-crystal composite duct board
Separate publication with the same broad sales description; board and fabricated-system scope must be agreed. Source
Visible fabrication forms
Rectangular straight sections, elbows and flange connections
Actual five-image gallery inspected. No numerical dimensions, thickness or tested joint construction confirmed. Source
Selected panel build-up
Not specified in the reviewed publication
Face metal/grade/coating, core, bonding and layer thickness need the actual offered construction. Source
Fire, pressure and leakage ratings
No numerical assembly rating reproduced
Application labels and photographs are not configuration-matched test evidence. Source
03 / PROJECT REVIEW
Jinyi: clarify what is supplied before assessing a duct system
Board supply and completed ductwork are different enquiries
Jinyi’s steel-faced composite duct page and composite-board page share a general sales description. Their headings distinguish products, but the readable text does not provide the layers, thicknesses, joint details or tested dimensions needed to treat them as interchangeable assemblies. The distinction below is an enquiry boundary, not an assertion that the supplier owns every process. (Sources 2 and 3.)
If buying board
Identify the complete panel construction, face material, core specification, thickness and sheet size. Establish who cuts, fabricates and joins it into ducts; a board quotation alone does not define the completed duct system.
If buying fabricated ductwork
Require the actual section schedule, joints, reinforcement, supports and connection details. Establish whether fabrication, accessories, transport and installation are included in the offer rather than relying on the board’s catalogue name.
The selected construction needs its own performance evidence
The reviewed steel-faced product page does not give a readable numerical fire-resistance classification, test-report number, pressure class or leakage result. No fire rating, thermal-conductivity value or permissible service temperature has been assigned to it in this profile. The neighbouring board page also uses general sales copy instead of a panel specification. (Sources 2 and 3.)
For a smoke-exhaust duct enquiry, request the original assembly report and compare its face/core construction, thickness, joint arrangement, dimensions, supports and installation orientation with the proposed system. A report concerning only a material or a differently constructed duct does not by itself establish performance of the ordered assembly. The website’s smoke-exhaust application category is a catalogue category, not a matched test result.
For central-air-conditioning use, the selected supply also needs an agreed pressure and leakage basis and any required insulation and moisture-control arrangement. Those project requirements should be answered with the supplier’s specific proposed construction. They are not published ratings of Jinyi’s products and should remain open until the quotation supplies supporting details.
What the independent list adds—and what it cannot add
The complete 39-page enterprise-list PDF was downloaded and read after the official pages. On page 34, row 1453 matches the company name and code above. The list’s columns concern enterprise identity and scale classification; this review does not derive plant output, quality, creditworthiness or a fire-product approval from that listing. A publication date was not established from the document itself. (Source 4.)
Supported: a named entity reference
The government-hosted document contains the exact Chinese name and unified social credit code. Use that code when matching the contracting entity and any documents supplied for an order.
The list does not identify the board manufacturer, duct fabrication site, test-report holder or quoted assembly. Ask Jinyi to identify those parties and match their documents to the supply being offered.
Do not import generic website copy into a factory biography
The home page includes wording about automation-related products and support that does not explain the listed duct construction. The specific company-introduction page has no substantive readable history. Those omissions are reflected here instead of filling the profile with a standard founding story, production-line inventory or capacity estimate. (Source 1.)
The actual composite-product pages promise contacts for pre-sales, sales and after-sales service, but do not set a geographical service boundary, installation scope or contractual response time. For a duct order, identify who prepares fabrication drawings, approves site dimensions and handles damage or changes after delivery. Keep those responsibilities in the quotation and handover record; do not assume installation support from a general service sentence.
Jinyi’s profile is consequently strongest as a documented supplier enquiry rather than a verified factory-capacity assessment. A plant address, fabrication evidence and a configuration-matched test package would materially strengthen it. Those records remain missing and have not been replaced by marketing claims from unrelated companies.
07 / TRANSPARENCY
Sources and review scope
Compiled by HVACDeck Editorial. Page review: 2026-10-07. Publications are attributed below; their statements are not independent measurements by this platform.
Jinyi official company-introduction page — source 1Checked 2026-10-07 · Read after page load: contact information but no substantive company biography. Contact address is not treated as a verified factory location.
Steel-faced magnesium composite ducts — source 2Checked 2026-10-07 · Individually read full loaded body. Published 2022-07-01; sales-scope description without a complete construction or numerical fire-performance schedule.
Magnesium composite duct board — source 3Checked 2026-10-07 · Individually read. Published 2022-06-30; separate heading with general sales description. No specific board schedule inferred.
Zhejiang government-hosted enterprise list — source 4Checked 2026-10-07 · Complete PDF read: page 34, row 1453, exact company name and code. Document date unestablished; not product certification or capacity evidence.