MANUFACTURER / SOURCE REVIEW

Fulaiya · column radiators and hydronic heating equipment

Henan Fulaiya HVAC Equipment Co., Ltd.

Review the actual radiator output condition, water-system compatibility and fabrication evidence; a government enterprise listing is separate from product testing.

周口市, 河南省, China

Prepare a technical enquiry
1 published equipment referenceLatest source review 2026-10-11
01 / COMPANY

What this manufacturer offers

河南省福莱雅暖通设备有限公司 describes steel column and copper/steel-aluminium composite radiators, ventilation/air-conditioning equipment, air-source equipment, fans and valves. Its contact page locates Fulaiya Industrial Park at No. 888 Zhoujie Road, Zhoukou, Henan. A broad HVAC catalogue does not establish the same performance, certification or service scope for every family.

The FGGZ2 radiator item contains two original images rather than a text specification. The inspected parameter image lists eight designations, connection centre distances, heat-transfer areas, a working-pressure column and section heat outputs under a printed ΔT=64.5° condition. This is useful selection evidence, but an authenticated model test report and low-temperature output relationship are still needed for an actual heating design.

Official legal entity
河南省福莱雅暖通设备有限公司Match the offer, invoice and bank beneficiary to the contracting entity. Source
Contact address
No. 888 Zhoujie Road, Fulaiya Industrial Park, Zhoukou, HenanOfficial contact wording; confirm dispatch/site-service location. Source
Government enterprise entry
2026 first-batch technology SME list · row 269Exact entity and entry number 2026411624A0000269 in original page 13; not a radiator certificate. Source
Reviewed product evidence
FGGZ2 · eight image-table variantsCatalogue output condition and pressure wording retained; no universal heat-pump output inferred. Source
02 / EQUIPMENT

Published equipment and selection evidence

Parameters and source limits · FGGZ2

Swipe the table, or focus it and use arrow keys, to read conditions and sources.

Manufacturer-published information · FGGZ2
ParameterPublished valueConditions and evidence
FGGZ203300 mm centres · 61 W/sectionPrinted ΔT=64.5° catalogue output; not a low-temperature or installed-system rating. Source
FGGZ204400 mm centres · 68 W/sectionSame printed condition; selected bank and connection details still required. Source
FGGZ205500 mm centres · 77 W/sectionSame printed condition; no universal temperature correction provided. Source
FGGZ206600 mm centres · 90 W/sectionSame printed condition; centre distance is not overall height. Source
FGGZ209900 mm centres · 121 W/sectionSame printed condition; confirm exact offered configuration. Source
FGGZ2121,200 mm centres · 152 W/sectionSame printed condition; no complete-bank dimensions supplied. Source
FGGZ2161,600 mm centres · 176.5 W/sectionSame printed condition; allow selected mounting/connection clearance. Source
FGGZ2202,000 mm centres · 206.6 W/sectionSame printed condition; confirm site dimensions and handling. Source
Working pressure column1.2 MPa for all eight listed rowsSupplier working-pressure wording; not test pressure, burst pressure or installation approval. Source
03 / PROJECT REVIEW

Evaluate Fulaiya through a condition-specific radiator selection

Separate catalogue breadth from the supply package

The profile presents a manufacturing scope spanning radiators, ventilation and other heating equipment, with particular emphasis on industrial coal-chemical, power-generation and civil uses. For a radiator order, establish whether the supplier provides bare emitters, assembled banks, valves/accessories, controls, delivery or installation. An air-source product category does not by itself prove that a particular column radiator has adequate output at a heat pump’s selected water temperatures.

The FGGZ2 photograph shows a white column-form emitter with top and bottom connection points. It does not identify steel wall thickness, connection thread, internal coating formulation or the section count of an offered bank. Use an approved drawing and material/connection schedule, not appearance alone, to connect the catalogue to the quotation.

Treat production scale as a claim requiring order evidence

Fulaiya’s profile claims RMB 50 million assets, more than 200 staff, 30 senior technical personnel, more than 100 skilled workers and more than 100 production-equipment sets. It also claims a 50,000 m² site, 20,000 m² building area, annual production above two million radiator columns and above 100,000 other HVAC sets. These statements were read on the official page; they were not independently audited here.

For a large supply package, ask for current line capacity for your exact construction, bank sizes, coating and test process, with a dated inspection and dispatch schedule. A total annual column count cannot be treated as available stock or a guaranteed lead time for a project. Agree sampling, traceability and handling of drawing revisions before releasing production.

Use original government evidence without extending its meaning

The original Henan government attachment titled 河南省2026年第1批入库科技型中小企业名单 includes 河南省福莱雅暖通设备有限公司 at row 269 on page 13, with entry number 2026411624A0000269. This independently supports that specific enterprise-list entry. It does not certify FGGZ2 thermal output, pressure resistance, corrosion life or suitability for an industrial hazard.

The official profile separately uses designated-enterprise wording linked to construction/heating-radiator organisations. No corresponding current appointment document was authenticated. The reviewed “Qualifications and Honours” page displayed a title and site navigation but no substantive certificate records/images; do not infer ISO or product approvals merely from that menu.

Official government list

Entity and 2026 entry number verified against the original attachment; limited to enterprise-list status.

Read the source

Official honour page

No readable certificate content available in the reviewed page; a certificate claim remains unverified.

Read the source

Actual FGGZ2 table

Supplier catalogue values at a named temperature-difference condition; not a witnessed model-test report.

Read the source

Request a relevant reference rather than a famous project name

The case index lists twelve projects, including coal-chemical and steel-industry names, residential/building sites and Asian Games venue wording. The index alone provides no supplied model/quantity, installation date, water conditions or signed acceptance. These are supplier-presented references rather than independently confirmed endorsements.

For an industrial heating enquiry, ask for a comparable system temperature, pressure and water-quality regime and the actual emitter construction supplied. For residential work, compare room loads, connection layout, controls and access. Require permission and documents before treating a client name or building photograph as proof of successful FGGZ2 performance.

Close thermal and water-quality requirements before price comparison

The image table prints heat output at ΔT=64.5°, not a rating valid for every supply/return temperature. Give the room design temperature, water supply/return conditions and room-by-room load, and require a tested output curve or applicable correction relationship. The national standards platform identifies GB/T 13754-2017 as the current recommended thermal-output measurement method; this reference is a report-review aid, not evidence that the item was tested to it.

The image also claims an internal anticorrosion coating and long service life without a formulation, test duration or water-quality limit. Obtain written limits for pH, oxygen, treatment chemicals and system filling/maintenance, with the agreed pressure/temperature envelope. Keep pressure acceptance and thermal acceptance separate.

Prepare an accountable enquiry and handover

The official contact page publishes an email retained in the private CRM field. No email has been sent. The reviewed pages do not establish a fixed price, MOQ, warranty duration, response time or overseas field-service arrangement.

  1. Provide the heating schedule

    List room loads, water/room temperatures, pressure, water-quality constraints, dimensions and connection arrangements.

  2. Approve the offered banks

    Close variant/section count, output evidence, materials/coating, pressure-test records and supplied valves/brackets.

  3. Agree delivery and support

    Set packing/handling, staged dispatch, installation/commissioning responsibility, spare parts and written warranty terms.

07 / TRANSPARENCY

Sources and review scope

Compiled by HVACDeck Editorial. Page review: 2026-10-11. Publications are attributed below; their statements are not independent measurements by this platform.

  1. Official Fulaiya company profileChecked 2026-10-11 · Actual scope/scale statements read; unverified production/designation claims attributed.
  2. Official Fulaiya contactChecked 2026-10-11 · Actual address/contact read; email remains private.
  3. Official FGGZ2 item and original parameter/product imagesChecked 2026-10-11 · Both original images actually inspected, including condition-specific table.
  4. Official qualifications and honours pageChecked 2026-10-11 · Actual page displayed no substantive certificate content.
  5. Henan government original 2026 first-batch technology SME listChecked 2026-10-11 · Original title and page13/row269 read; enterprise entry only.
  6. Official project indexChecked 2026-10-11 · Actual 12 entries read; no independent client acceptance inferred.
  7. SAMR current GB/T 13754-2017 recordChecked 2026-10-11 · Actual official status/title read; no claim that FGGZ2 has a qualifying report.
  8. Original FGGZ2 parameter imageChecked 2026-10-11 · Actual image viewed, not OCR/snippet-only; no floor-area or water-volume conversion.

How we review sources · Represent this factory or request a correction

Continue your equipment research

Prepare your equipment brief