MANUFACTURER / SOURCE REVIEW

Henan Jinchuang · Cooling-tower manufacturing and model evidence

Evaluate a matched Zhengzhou identity, actual crossflow/counterflow offers and the exact CTI/CQC model boundaries.

Zhengzhou, Henan, China

Prepare a technical enquiry
2 published equipment referencesLatest source review 2026-10-11
01 / COMPANY

What this manufacturer offers

Henan Jinchuang Refrigeration Equipment Co., Ltd. is a cooling-tower manufacturing lead based in Zhengzhou's Airport Economic Comprehensive Experimental Zone. The preserved CRM row records establishment on 11 April 2016 and manufacturing scope for refrigeration/air-conditioning equipment and reinforced-plastic products. The official company page agrees on the 2016 founding year, and its contact address matches the registered Mingang Manufacturing Industrial Park phase-one address. This is an identity and sourcing check, not a fresh registration audit or a factory visit.

The actual reviewed portfolio includes JCR crossflow and JCN counterflow towers. A current browser review of the Cooling Technology Institute directory identifies the JCR line under C149, linked to a six-page disclosure dated 9 January 2024. That document provides model and condition-specific design data. A separately read CQC list also names Jinchuang as manufacturer for specified JCR-L/SB models, with certificate dates that must be kept distinct from the CTI model codes. Two production bases, approximately 140 employees and export experience are supplier statements without independent site or staffing verification.

Legal identity
河南金创制冷设备有限公司; CRM establishment 11 April 2016Official about page agrees on year; no live registry audit. Source
Registered/contact location
Mingang industrial park phase one, 3-01-101, Zhengzhou Airport ZoneCurrent website contact matches preserved CRM; exact production-site visit still needed. Source
Actual reviewed offers
JCR crossflow and JCN square counterflow cooling towersDistinct product pages read; other category names not automatically published. Source
CTI evidence
C149 directory JCR line; C149A-24R00 disclosure, 9 January 2024Thermal line/model evidence, not certification of every Jinchuang tower. Source
CQC dated model list
JCR-100L/SB through specified JCR-900L/SB entriesCertificate numbers CQC24701421896 and CQC24704421895; current suspension/revocation not checked. Source
Reported operating scale
Two bases and approximately 140 employeesOfficial supplier statement; not verified current capacity or employment. Source
02 / EQUIPMENT

Published equipment and selection evidence

Parameters and source limits · JCN square counterflow family

Swipe the table, or focus it and use arrow keys, to read conditions and sources.

Manufacturer-published information · JCN square counterflow family
ParameterPublished valueConditions and evidence
Family constructionSquare counterflow FRP towerOfficial JCN page; no issued selected-model table. Source
Described heat-transfer partsFill and low-noise aluminium airfoil axial fanNo selected fill material, thermal curve or sound figure inspected. Source
Structure/casingGalvanized steel; FRP basin/casing panelsSupplier description; ordered grades/thicknesses and load data required. Source
Motor optionTwo-speed motor to user requirementsOptional; selected electrical/control schedule not published. Source
Cell service descriptionModular arrangement with separated adjacent air chambersActual isolation and remaining duty must be agreed. Source
Quantitative gapsFlow, thermal temperatures, motor duty and soundHigh-temperature/low-noise words do not supply numerical ratings. Source
Certification scopeNo inspected JCN-specific thermal certificateJCR CTI/CQC evidence not extended to JCN. Source
Parameters and source limits · JCR crossflow line

Swipe the table, or focus it and use arrow keys, to read conditions and sources.

Manufacturer-published information · JCR crossflow line
ParameterPublished valueConditions and evidence
Disclosed constructionOpen-circuit, crossflow, induced draftCTI disclosure identifies the line; not a closed-process-fluid coil. Source
Dated thermal evidenceC149A-24R00, 9 January 2024Current directory links document; exact selected-model status still requires issuer/order verification. Source
Example model dutyJCR-183139A: 22.8 l/s at 37/32/28°CMatrix specifies inlet 37°C, outlet 32°C, wet bulb 28°C; not universal flow. Source
Example dimensions1800 × 3100 × 3950 mm (L × W × H)Documented model outline; current issued installed drawing needed. Source
Example fan/motor1350 mm fan; 3 kW motorNot complete system input or a witnessed sound rating. Source
Another condition for same model20.2 l/s at inlet 32°C, outlet 27°C, wet bulb 21°CCondition-reference 46, range 5°C/approach 6°C in selection matrix. Source
Multi-cell scopeEnd-wall to end-wall cells; suffix indicates cell countDisclosure permits arrangements that do not affect individual-cell flow/capacity; not arbitrary layouts. Source
Materials/options in disclosureGalvanized/stainless structure; PVC/FRP casing; non-thermal accessoriesActual ordered construction must match applicable scope. Source
03 / PROJECT REVIEW

Match the tower construction and certificate scope to the ordered model

Choose between actual crossflow and counterflow offers

JCR is identified in the reviewed CTI material as open-circuit, crossflow and induced draft. JCN is promoted on the official product page as a square counterflow FRP tower, with fill, a low-noise axial fan and modular combinations. These require different selected air/water layouts rather than one generic tower price.

Issue design water flow, entering/leaving water temperatures, site wet bulb, available space and sound requirements. Ask for the ordered model selection and identify the actual fan, motor, fill and water-distribution package. Family names do not establish performance at the site's limiting weather.

Keep the two external model namespaces separate

The CTI directory reviewed in this research links the JCR line to the dated C149A disclosure. Its listed model codes and permitted multi-cell configuration belong to that disclosure. The CQC publication uses another set of JCR-L/SB names. No mapping between them is invented.

Require the exact current ordered-model evidence and any claimed equivalence from the supplier and issuer. The CQC list records 20 January 2025 effectiveness and 19 February 2027 expiry for the inspected entries; a dated list does not independently establish today's suspension or revocation state. None of this evidence is extended to JCN, JCT or closed towers.

Verify production capability through the ordered construction

The website says Jinchuang develops, produces, sells and services FRP towers and reports two bases. Request the exact manufacturing location and responsibility for FRP fabrication, steelwork, bought-in fans/motors/fill and final assembly. Obtain order-relevant inspection and material records.

The reported staff count and named customer projects have no independently inspected site or customer evidence here. They are not used as guaranteed throughput, available stock or platform endorsements. The contact page also names Anhui Lingchuang as an Anhui operation; this profile does not merge that separate legal name into Jinchuang's registration.

Reject unsupported data even when it appears on the official site

The reviewed JCT page mixes different constructions and includes another company's name, generic fields and a zero-price placeholder. Those passages are excluded from this profile's verified manufacturing/performance evidence. The closed-tower category returned no product data and is not used to create an empty product page.

Use selected drawings and rating documents to resolve actual construction and certification. A long supplier webpage is not automatically a coherent specification. Marketing low-noise, anti-ageing and maintenance-free language must be backed by the ordered materials, operating conditions and acceptance criteria.

Build the enquiry around interfaces and acceptance

Request model selection, structural loads/dimensions, hydraulic connections, fan/motor duty, sound basis, water treatment and commissioning scope. Agree thermal acceptance at defined wet-bulb and water conditions and distinguish factory records from an installed performance test.

The official email is stored in a private CRM field for a later authorised claim process. No email has been sent. Current price, lead time, verified production capacity and independent installed results remain unknown.

  1. Issue tower duty

    Provide water flow/temperatures, wet bulb, footprint and sound requirements.

  2. Approve the exact model

    Match construction, model code and current issuer evidence without assuming CTI/CQC equivalence.

  3. Accept the delivered system

    Agree materials, connections, installation and witnessed thermal/sound criteria.

07 / TRANSPARENCY

Sources and review scope

Compiled by HVACDeck Editorial. Page review: 2026-10-11. Publications are attributed below; their statements are not independent measurements by this platform.

  1. Official company profileChecked 2026-10-11 · Complete manufacturing/founding/portfolio statements read; reported operating scale treated as supplier information.
  2. Official contact pageChecked 2026-10-11 · Exact legal name/address and website email reviewed; separate Anhui legal-name reference not merged.
  3. CTI JCR disclosureChecked 2026-10-11 · All six pages read; model scope, dated validation, dimensions and condition matrix inspected; original table pages visually checked.
  4. CTI certification directoryChecked 2026-10-11 · Actual browser directory identifies C149 Henan JinChuang and links the JCR disclosure during this review.
  5. CQC published certificate listChecked 2026-10-11 · Relevant manufacturer/model entries on pages 122–123 and 149 read; effectiveness/expiry separated from current issuer status.
  6. Official JCN counterflow tower pageChecked 2026-10-11 · Complete construction/options/service text and original multi-cell photograph read; no numerical model table or JCN certificate inspected.
  7. Official JCR product pageChecked 2026-10-11 · Complete qualitative feature text and original tower photograph read.

How we review sources · Represent this factory or request a correction

Prepare your equipment brief