01 / UNDERSTAND THE EQUIPMENT

Match the duct wall to the complete tested and installed system

Qinye’s aerogel fire-resisting duct is described as a factory-made sandwich construction: 0.5 mm inner galvanised steel, 10 mm silicon-based aerogel composite and 0.75 mm outer galvanised steel. The original photograph shows rectangular flanged sections. Those stated layers are useful construction evidence, but they do not by themselves establish a compliant installed smoke-extraction duct.

The supplier claims fire resistance up to two hours and displays a commissioned duct-test cover FG0506121-2021 naming the same company. No complete results, specimen dimensions, orientation, joint/support arrangement or field-of-application file was established. Its separate material-temperature and comparative cost/life claims are not adopted as assembly performance. Use this brief to request the exact tested duct configuration, project design approval and installed-system acceptance; a maximum family claim is not a rating for every size, joint or penetration.

02 / READ THE CONDITIONS

Published parameters and their scope

This is an equipment family; its range does not identify one orderable configuration.

Family designation
Aerogel sandwich duct family

Swipe the table, or focus it and use arrow keys, to read the conditions and sources.

Manufacturer-published values · conditions are part of the specification
ParameterPublished valueConditions and evidence
Published inner skin0.5 mm galvanised steelSupplier-described sandwich construction; actual order material and tolerance need confirmation. Source
Published core10 mm silicon-based aerogel compositeNo verified conductivity, density or complete material certificate established. Source
Published outer skin0.75 mm galvanised steelDoes not establish hanger loads or a complete structural/fire rating. Source
Supplier assembly claimFire resistance up to two hoursClaim requires the full exact-scope report; not independently verified as an installed-system rating. Source
Original commissioned-test coverFG0506121-2021; Shandong Institute for Product Quality InspectionCompany and duct identity readable; cover contains no full conclusions or assembly scope. Source
Original visible constructionRectangular flanged duct sectionsPhoto read; actual joint sealing, support spacing, orientation and sizes unknown. Source

Selection and application review

Approve the supplied wall construction and materials

Request an issued cross-section, actual steel thickness/tolerance and coating specification, core identification and factory assembly procedure. The described 0.5/10/0.75 mm layers are one supplier construction; they are not evidence of an arbitrary size’s structural capacity or exact delivered materials.

Ask for traceability and the material/construction schedule for the order. A high-temperature claim for an aerogel blanket does not establish complete duct integrity, insulation or joint behaviour under fire exposure. No whole-assembly 1,500°C operating rating is inferred from the source’s material wording.

Read the entire fire test and scope before using two hours

The original report cover identifies a commissioned test and producer, but does not show duration, pass/fail findings, specimen arrangement or scope. Obtain the complete current file and confirm the tested construction, dimensions, orientation, exposure, joints, supports and acceptance criteria.

Have the responsible project designer match that scope to the intended installation and current applicable rules. The supplier page cites older design-standard editions and summarises installation locations. Those summaries are not current project-specific compliance advice, and this page does not reproduce them as universal installation instructions.

Close flanges, supports and fire-compartment interfaces

The photo shows rectangular flanged sections; it does not define bolt spacing, seals, support spans, access doors or penetrations. Ask for actual joint details, hanger design, loads, maximum spans and the tested limits for each. Resolve duct-to-fan and duct-to-damper connections within the same approved system.

Coordinate penetrations, fire stopping and interfaces with the building design and installation contractor. A wall/core material alone cannot prove the compartment boundary. Approve fabrication/installation tolerances and inspection access before treating factory-made sections as ready for every site configuration.

Evaluate geometry, air duty and maintainability

Issue required airflow and system resistance, clear section size, routing, connection geometry and available ceiling/service space. Request the actual dimensional and leakage/pressure specification. The source provides no complete pressure class, flow resistance or leakage result for a selected duct.

Decide how inspection and cleaning access will be supplied and maintained without changing the approved assembly. Factory manufacture and direct lifting are supplier positioning statements, not verified installation-cost or service-life savings. Compare quotations with equivalent geometry, joints, supports and tested scope.

Accept construction evidence and installation evidence separately

At delivery, match the marked construction and material records to approved drawings. At installation, check the specified joints, supports, penetrations and interfaces through the project’s agreed inspection process. Obtain the complete report and current exact-scope documentation before making any fire-performance assertion.

Price, lead time, independent installation results and universal compliance remain unknown. This individually written brief turns the actual wall specification into precise procurement questions while preserving the difference between a material, a tested specimen and an installed fire-resisting duct system.

  1. Freeze the layers and geometry

    Approve material identification, steel/core thickness and issued fabrication drawings.

  2. Match the test scope

    Obtain the entire report with specimen, joints, orientation and supports.

  3. Approve the installation

    Resolve project rules, penetration/interface details and inspection criteria.

Sources and review scope

Compiled by HVACDeck Editorial. Source review identifies what the publication states; it is not an independent performance test or certification.

  1. Official aerogel duct construction pageChecked 2026-10-11 · Full original page and product photograph read; layers retained, broad comparison and material-temperature claims not endorsed.
  2. Original supplier-hosted duct report coverChecked 2026-10-11 · FG0506121-2021 cover visually read; commissioned test/producer identity only, no full results or current scope established.

Editorial method and corrections · Report a detail with this page URL

Turn the evidence into an enquiry

Send the manufacturer your required duty, installation conditions and the unresolved items identified in this brief.

Other equipment from this manufacturer

Qinye dampers: thermal closure versus commanded smoke opening

Qinye LXPF cabinet fan: A/B duty and transmission access

Qinye SWF mixed-flow ventilation selection